Solar Potential

In DLF Phase 4 , solar panels can generate around 1400 kWh (units) per annum per KW for next 25 years. The solar panel generation peaks in summers and goes down in Monsoon and foggy winters as expected.

Commercials

In DLF Phase 4, the solar panels can generate enough electricity to recover the cost of power plant within 4 -5 years while the owner enjoys FREE solar energy for next 25 years.

Area Required

In DLF Phase 4 , 1 KW solar panel will need a shadow free area of around 10 sq yard. Therefore a plot size of 100 sq yards can do a 5 KW of solar system assuming roof size at 50% of the plot size. On the same lines, a 200 sq yard plot will have 10 KW, a 300 sq yard will have 15 KW, a 400 sq yard will have 20 KW and 500 KW will have 25 KW.

Sizes of solar systems

Already a number of houses and buildings have opted for solar system in DLF Phase 4 and near by areas. Generally the houses and commerical buildings have solar systems of sizes varying from 1 KW, 2 KW, 3 KW, 5 KW, 10 KW, 15 KW and upto 25 KW at DLF Phase 4

Subsidy / Incentives

MNRE subsidy is also available for any new solar system in the buldings located at DLF Phase 4. Haryana government also provides incentives of Rs 0.50 per kWH on the solar electricity produced from solar systems

Get in Touch

If you have any queries related to solar power or solar energy , don't hesitate to send us your message.

Your message was sent successfully! I will be in touch as soon as I can.

Something went wrong, try refreshing and submitting the form again.